Decoration project construction schedule decoration project construction precautions

The decoration project construction is a relatively large thing, so we need to pay more attention to the construction. The progress of the decoration also requires us to plan in advance. The materials and quality of the project need to be inspected, then the renovation project What are the construction schedules ? What are the renovation projects that need our attention? Next, let us introduce them to the small series of the decoration home network.


装修工程施工进度表


First, the renovation project construction schedule


1. Before the residential decoration project, it should be checked that the drainage pipe is unblocked, and the foundation and the basic layer are qualified before construction.


2. After the completion of the management engineering, electrical wiring, and electrical installation, other decorative works can be carried out.


3. The decoration of the living room should be carried out according to the following procedures:


→ Fine wood decoration → paste → electrical installation → floor covering → paint ceiling coating → fine wood decoration → electrical installation → floor covering → paint.


4. The living room decoration project should be carried out according to the following procedures:


→ Fine decoration → paste → electrical installation → paving the floor material → paint ceiling → paint → fine wood decoration → electrical installation → paving the floor material → paint.


5. Kitchen decoration works should be carried out according to the following procedures:


Coating → masonry platform → fine wood decoration → wall surface, cabinet surface decoration tile → electrical appliance, electric water heater installation → paving the floor material → paint → gas take over.


6. The bathroom decoration works should be carried out according to the following procedures:


Ceiling→Three-piece installation (connecting water pipes)→Wall surface, bathtub apron→Bathing installation (Electrical installation Bu paving floor material→Oil


装修工程施工进度表


Second, the renovation project construction matters needing attention


1. Before the construction personnel enters the construction site, they must carry out the construction safety and fire protection knowledge education and assessment work. For employees who fail to pass the assessment, it is forbidden to enter the construction site to participate in the construction.


2, must enter the construction site to wear a helmet, fasten the cap, and use personal protective equipment. Strictly implement the operating procedures, and must not violate the rules of command and illegal operations. The instructions for violation of the rules have the right to refuse and have the responsibility to stop other people from operating illegally.


3, on-site electricity, must be managed by a special person, at the same time set up a dedicated distribution box, is strictly prohibited to pick up the chaos, take the electricity listing system, especially to prevent illegal operations, to prevent personal, line, equipment accidents.


4, construction site lighting power, must use a safe voltage below 36 volts, all electrical appliances when not in use, must cut off the power at any time to prevent burning equipment. Personal protective equipment must be properly worn during work and a helmet must be worn when entering the construction site. Do not use the fire privately. It is strictly forbidden to operate after drinking.


5. In the place where the blowtorch, electric welder and necessary fire are used, it is necessary to fill in the application for registration by fire and set up a special person to take care of it, and accompany the fire-fighting equipment to ensure the implementation of fire-fighting measures. When welding, pay special attention to check whether there is flammable material underneath, and do the corresponding protection. Check it after use, and confirm that there is no fire and then leave.


The construction of the renovation project is dangerous. Therefore, we need to understand a series of safety measures. What are the construction schedules and construction precautions for the renovation project? I think everyone can understand through the introduction of Xiaobian. I hope that you will have something to do with it. Help, then if you still want to know more about decoration, please continue to pay attention to the decoration home Internet cafe.


More related wonderful reading:

Decoration and decoration project quality acceptance specification decoration acceptance notice

Decoration and decoration project budget decoration project notes

Architectural decoration engineering design and construction management, decoration skills

Renovation settlement list notes matters needing attention for renovation project settlement

Renovation project completion acceptance procedure decoration project settlement process