Field inspection quality inspection can not be taken lightly

Estimated duration of wooden doors and windows project: wooden doors and windows project is the project of the demon in the time of home decoration. After the construction of the basement structure, the construction should be started and completed before the completion of the project. The specific construction period is two days for making a Meixinmen carpenter, one day for the renovation, one half day for the installation (including hinges, locks, door stoppers, etc.), and one day for the finish paint and the rest for the process. waiting time.
Construction and acceptance of wooden lattice ceilings
1, the role of wood grille ceiling: wood grille ceiling is different from other ceiling projects, should be attributed to joinery decoration, wood grille ceiling is the family decoration corridors, entrances, restaurants and other methods are often used in the top beam space . Wooden grille ceiling can not only beautify the top, but also can achieve the purpose of adjusting lighting and increasing the overall decoration effect of the environment. It requires generous design, reasonable structure, beautiful appearance, firm fixation, smooth surface, uniform color, scientific layout of internal lighting, complete paint finish, no scratches, no pollution, etc.
2. Installation of wooden grille ceiling: The production of wooden grille skeleton should be based on the accurate measurement of the ceiling size. The keel should be finished, the surface should be planed, the joint should be opened, and the horizontal and vertical keel joints should be opened with a half-groove joint. The flame retardant coating should be applied. During the installation, according to the design, the elevation control line and the suspender installation line shall be popped. The wooden mold shall be drilled on the wall surface and the ceiling, and the ceiling hanging piece shall be fixed on the inner hook of the keel with a thick wire. When the installation is completed, the integral lifting method is adopted to move the wooden grille frame as a whole above the elevation line and connect it with the hanging piece on the ceiling. After all the hanging pieces are connected with the grille frame, the grille surface is leveled by adjusting the length of the hanging piece. After adjusting the grille frame to be level with the control line, fix the surrounding wooden keel to the wall. The surface treatment of the wooden grille skeleton surface is generally to paste more valuable wood thin pieces, install the lighting fixtures and close the decorative lines, the lamp base can be installed during the production of the wooden grille skeleton, and the power is turned on after the hoisting. The grille frame trim strips should be installed on the ground, and the ceiling installation should be followed by a closed line seal. After the wooden grille is installed, it is necessary to apply a clean oil coating to the finish, and then install the frosted glass after brushing.
3. Common quality problems and treatment methods for grille ceilings: The common quality defects of wooden grille ceilings are grid unevenness or irregularity, uneven surface, collapse, and arching. The grid is uneven or not square, mainly due to the fact that the foundation walls are not square or the vertical and horizontal grille openings are not vertical. Therefore, before installing the wooden grille skeleton, deal with the foundation wall to find the square, first use the ruler to measure the angle and the angle of each side, if the error is not large, you can use the putty to shave the wall to find the square, if the error is large, You should first pad the board and then level it with putty. When splicing vertically and horizontally, the keel grid must be vertical. Otherwise, it should be repaired and installed. The main reason for the unevenness, collapse, and arching is due to the fact that, in addition to lax sticks during construction, wood deformation, too thick frosted glass, and heavy lighting fixtures are also important reasons. Therefore, in the construction should choose not easy to deformation of the loose surgery skeleton, frosted glass with a thickness of 3 mm is appropriate, lighting can be installed on the ceiling or choose light materials to prevent overloading the ceiling load. If there is arching, the hanging parts can be adjusted so that the top surface is flat.
4. Estimated duration of wooden grille ceilings: Wooden grille ceilings are relatively costly and complicated projects, involving many materials, preparation, production time is longer, the need for decorative paste, surface brushing, glass installation and other needs after installation Careful operation, meticulous construction, more man-hours and higher technical standards. The wooden grille ceiling is about 15 square meters. It takes about 10 days from the start of stock preparation to the completion of the work. The dragon skeleton is processed and manufactured for 2 days. The stock preparation and installation are 2 days. The decorative decoration is 3 days. Others are waiting time for the craft. Intersection with other woodworking or parallel operations. The duration will vary depending on the degree of structure and the use of materials.
The construction and acceptance of suspended ceilings for cavitating wells There are many forms of suspended ceilings. There are paint ceilings, wallpaper ceilings, wooden ceilings, and veneer ceilings from the materials used. There are light steel keels, aluminum alloy keels, and wooden keel ceilings from the structure. The shape is divided into a plane ceiling, algae ceilings and shaped ceilings. In home decoration, wood keels are generally used as skeletons, and gypsum boards or wood are used as panels, paints, or wallpapers as vine-type ceilings for decorative finishes. This kind of suspended ceiling can overcome the contradiction between the low and top of the room, facilitate the on-site construction, improve the grade of decoration, reduce the construction cost, and achieve the purpose of top decoration. Therefore, it is widely used.

The inspector can not save the place aisle ceiling glass lighting paint home decoration decoration glass glass door grille restaurant ceiling

Swing Device

Excavator Swing Gearbox in Shandong offered by Jining Juheng Hydraulic Machinery Co., Ltd. Get Best Price, MOQ for Travel Gearbox along with Contact Details, Address.

1. The gear parts are built to fit to the genuine drive gearbox system.

2. The gear parts are supplied strictly according to the genuine parts catalog.

3. All the gear components are manufactured from carefully selected materials with standard quality using standard production process heat treatment processes - including carburizing, nitriding, and induction hardening.

4. Surplus stock and the various varioties of gear parts that cover final and swign drive for upto 70 Tons excavator. HITACHI KOMATSU HYUNDAI Vo-lvo DOOSAN KOBELCO SUMITOMO KATO JCB

This column mainly shows the parts of the crawler excavator Swing Device.The Hitachi Swing Device includes two parts: a Swing Motor and a Swing gearbox.

These gearing relationships and the power they provide is known as your Final Drive ratio. By dividing the number of teeth in your ring gear by the number of teeth in your planetary gears, you arrive at that number. Generally speaking, a higher final drive ratio will mean more torque at the tracks but a lower top speed.

In the Track Motor shop, you will find high-quality final drives for almost every Komatsu excavator model. Travel motors from our shop are made in modern and fully automated factories. Thanks to this, we can guarantee that every spare part is equal to an original Komatsu one. This allows us to provide a full warranty and post-warranty service on all of our products in stock. The travel motors available from us are labelled with the same markings as the corresponding excavator models.

We are a professional manufacturer of hydraulic accessories for crawler excavators Professionally provided aftermarket customers with various brands of crawler Excavator Final Drive, Travel Motor , Travel Gearbox,Swing Device, Swing Motor,Swing Gearbox,hydraulic pump, main Control Valve and other accessories.Strictly controlling the quality acceptance of each product Standards to ensure high-quality qualified export of each product.At the same time, we can customize the production services of the products through the drawings according to customer needs, and make every effort to make the perfect product in the mind of each customer.

Perhaps even more amazing is that, with proper maintenance, your final drive motor can do all that impressive work for many years. Those worker ants may only survive a few weeks! As you can imagine, because of the engineering and workmanship that goes into these final drives, they can be quite expensive to repair or replace when they reach the end of their lives. That`s where we come in. We can help you save a ton of money and get back to work fast!

Excavator Swing Gearbox Accessories
If you want to know more about our products in more detail, please click on the product details to see more information about product quality, price, packaging, transportation, etc., or you can directly click on Contact Now on the page to talk to us directly. Looking forward to starting long-term business cooperation with you!

Excavator Swing Gearbox,Swing Motor With Gearbox,Hitachi Swing Motor,Hitachi Swing Device

Jining Juheng Hydraulic Machinery Co., Ltd. , https://www.juheng-cn.com