Before the construction, it should be clear what the construction project is, whether it is needed by itself, whether it is reflected in the decoration contract, and whether it should be constructed according to the contract. If there are items that need to be adjusted during the construction process, a written record must be made and both the owner and the constructor must sign and confirm.
Decorate and decorate
Six points of signing a renovation contract can not be ignored
1 schedule agreement
Generally 80 square meters of two-bedroom, simple decoration, the duration of about 35 days. To be on the safe side, decoration companies generally set a time limit of 45 to 50 days. If the owners are anxious to check in, they can negotiate with the decoration company at the time of signing.
2. Payment method
General decoration contract, agreed to pay 60% down payment, after the acceptance of the woodwork to pay 35% of the cost, after completion of 5%. In accordance with this form of payment, after the construction period passed about half of the time, the owner had already paid about 95% to the decoration company. Therefore, Guilin suggested that the owner can press the down payment to 30% and the medium-term 30% when signing the contract. This can make the owner not be in a passive situation.
3. Increase or decrease items
During the renovation process, it is easy to increase or decrease the number of items, for example, to make more cabinets, all of which must be paid at the time of completion. What should be the unit price of these items? If you wait until after the start of work, then this may be the construction party's final say. Therefore, it is advisable for the owner to make a copy of the complete quotation that the decoration company originally gave you, so that when signing the contract or increasing or decreasing the project, the decoration company will not be allowed to change the price and change the price.
4. Warranty Terms
The whole process of renovation is still based on manual production of the scene, without the realization of a full factory, so it is inevitable that there will be a variety of quality issues. During the warranty period, the responsibility of the decoration company is particularly important. For example, if there is a problem, the decoration company is responsible for the entire warranty, or only the contractor is not responsible for the material warranty, or other restrictions, which must be clearly written in the contract.
5. Hydropower costs
During the renovation process, on-site construction will use water, electricity and gas. Generally speaking, at the end of the project, the utility bills add up to a number that is not too small. The cost should be paid by who should be indicated in the contract.
6. According to the construction
The decoration company should strictly follow the drawings signed and approved by the owner. If the detail size and the design drawings do not match, the owner can request rework.
Construction contract entrance decoration restaurant decoration decoration company decoration decoration design decoration
We are manufacturer of Water Bath Shaker in China, if you want to buy Shaking Water Bath Incubator,Best Water Bath Shaker,Water Bath Incubator Shaker please contact us.
Water Bath Shaker,Shaking Water Bath Incubator,Best Water Bath Shaker,Water Bath Incubator Shaker
Zenith Lab (Jiangsu) Co.,Ltd , https://www.zenithlabo.com