When the decoration master finishes work, does it mean that you can move in immediately? Please do not forget the last part of home improvement: Checking room. As more and more homeowners pay more and more attention to house inspections, they will teach and teach everyone today how to protect their immediate interests if they do a home inspection.
With the improvement of people's living standards year by year, the cost and grade of home decoration projects are getting higher and higher. At the same time, the quality of their projects has exposed more and more common problems. Home decoration is an important part of the interior decoration project. How to find solutions to these common problems, scientifically examine the quality of home decoration projects, and earnestly safeguard the interests of owners, has caused the concern of relevant management departments and consumers in general. Let's take a look at the last link in home improvement: Checking room.
Meiju doors and windows and sun room
First, the gas pipeline
The gas meter is a small thing that occupies space. How to adjust the position of this watch must also listen to the opinions of professionals. It must be transformed by the gas company. It is very important.
Second, inspection pipeline
The pipe referred to here refers to a drainage/pollution pipe. Utah is a sewage outlet such as a balcony. When it is accepted, take a water-filled appliance in advance and pour water into the outlet. See if the water is flowing smoothly. Why do you want to accept this? Because during construction, some workers often “stolen†this work when cleaning. Put some cement residue into the drain and run away. If the cement is more viscous, it will clog at the elbow and cause drainage difficulties. There is another situation, but it is not related to acceptance. That is to look at whether the sewage pipe has water storage deodorant elbow. According to experience, if the sewage pipe does not contain water and deodorant elbow, then the overall quality of the house will have to hit 12 points. Why do the sewage pipes need such elbows, because the elbows will store water so that the smell from the lower pipes will be blocked under this layer. Without an elbow, the laundry outlets and toilet drains emit a odor. There may be developers who think that the use of deodorant floor drains will work. The practice of the project proves that deodorant floor drains are far from meeting actual needs. And because of this small place, it is often best to reflect the construction quality of the builders.
Third, the roof
1. Check the roof for cracks.
2. Check whether the yin and yang corners of the roof and the wall are horizontal lines. If not, use a stucco plaster to lower the water level and then use a waterproof putty to level it.
Fourth, the wall
1. Check the wall for cracks.
2. Check whether there is empty drum on the wall. If you hit the wall with a small wooden hammer or something, the sound you make when you knock on the empty drum is not true. It is easy to hear it. Make a mark and fill it with putty during the renovation.
3, check the wall putty, whether it is waterproof putty, you can bring bottle of mineral water, splash water on the wall, hand to touch, to see if there is mud, if not proof of the wall of waterproof putty qualified.
Fifth, the ground
1. Check whether the ground is flat 2. Check whether there is cracking and backsuding: If there is sand on the ground when the ground is used on the ground. This problem occurs when mortar ratio or cement quality is unqualified and the mixing is uneven.
House inspection doors and windows entrance decoration window socket cement decoration home improvement glass door toilet door kitchen glass sliding door bathroom waterproof bathroom wash basin overall bathroom bathroom door
We are manufacturing high transmission and durability domes. BK7 or HK9L Glass domes are often used in meteorology applications. Fused silica domes are commonly used in underwater applications at extreme environments. Other application for our dome include meteorology applications, pyranometers, defence applications and as high pressure view ports in underwater cameras and submersibles.
Material:Optical glass N-BK7 , H-K9L, UV Fused Silica, Sapphire, and infrared crystal materials.
Diameter:20-350mm
Diameter Tolerance:+/-0.1mm
Thickness:>2mm
Thickness Tolerance±0.2~0.1mm
Center Deviation:3-5'
Surface quality:80/50 60/40
Coating: Antireflection Coating inside
Chamfers:0.2 x 45° typical
Hemisphere Dome Lens,Hemispheric Glass Domes Lens,Optical Glass Hemisphere Domes Lens,120 Mm Diameter Glass Dome Lens
China Star Optics Technology Co.,Ltd. , https://www.opticsrealpoo.com